Integra were employed by a regional main contractor Balfour Beatty, design, manufacture and deliver an L-Shape building which would form a part wrap around to the second phase of the project, a large Sports Hall.
Client | Balfour Beatty, Manchester City Council & GB Taekwondo |
---|---|
Cost | £715,000 |
Integra have undertaken a significant part of the building works with us, to construct the GB National Taekwondo Centre in Newton Heath in Manchester. It has been a pleasure working with Integra in a team working environment from the inception of the design, through the pricing stage and onto construction. The new facility has provided a significant platform for the GB Taekwondo team who went on to win 3 medals at the Rio Olympics earlier this year. The project has also provided an enhanced facility for the local community. At all times Integra have acted professionally in all their dealings with us, without any adversity, successfully agreeing the final account prior to completion of the Project. Works were undertaken with a high regard to safety. We would not hesitate to use this company again when the opportunity arises.
Integra buildings were asked to design, manufacture and build a 17 bay elite facility in Manchester. The newly constructed building was to connect in to an existing building.
Balfour Beatty would then construct a generous Sports Hall to be sited against our building. The centre would combine numerous facilities from across the Manchester and is the second project we have delivered on for GB Sports.
Bespoke Specification:
- The Design and Manufacture of a new building in 17no Modules
- Changing facilities to accommodate 72 athletes
- A lecture theatre, range of meeting rooms and offices
- Physio and Medical Suites with separate Performance Rooms
- Generous Open Plan Office, Kitchen with Break Out area and WC facilities